Based in Valrico, FL · serving about a 50-mile radius
Demolition · Land Clearing · Free Estimates (813) 239-4231
Global Constructionand Home Repair · Valrico, FL
Our Services

Selective Demolition in Valrico, FL

Selective Demolition · Valrico, FL

Take out part of the structure and keep the rest

Selective demolition means taking out part of a building while the rest stays standing. That is a different job than flattening a structure. The machine work stops at a line, and everything past that line stays protected. Global Construction and Home Repair is a demolition contractor in Valrico doing this work across the Tampa Bay area.

Most calls land in one of two places. An addition, a damaged wing or an attached garage comes off the house. Or the inside gets stripped to the studs for a remodel or a flood dry-out. A whole structure coming down is a full house demolition instead.

What We Handle

  • Additions, damaged wings and attached garages taken off a house
  • Ground-floor demolition under an intact upper level or ADU
  • Interior demolition down to the studs for a remodel or a re-fit
  • Flood gut-outs: wet drywall, insulation, flooring and cabinets removed
  • Walls, ceilings, tile, cabinets, fixtures and built-ins taken out
  • Concrete slabs and patios broken out section by section
  • Pools, driveways, trees and neighboring structures protected
  • Excavator work up to the cut line, hand work past it

Free Selective Demolition Quote

Tell us about the job. We will get right back to you.

Partial demolition when the rest of the house stays

A partial demolition starts with a line. We look at the structure and mark where the demolition stops. Then we work out how the piece coming off is tied to the piece staying. That means shared framing, a shared roof line, siding, wiring and plumbing running through the wall.

The separation happens before the excavator touches anything. Wiring and plumbing get cut back and capped. The wall that will be left exposed gets braced and closed in. Only then does the machine start pulling material down.

A Tampa Bay homeowner had the ground floor of a house flooded by Hurricane Helene. It had to come out while the garage and the ADU above it stayed, and the pool stayed too. The customer wrote that several other companies had declined the job. We took it down and left the rest standing.

Interior demolition and gut-outs to the studs

Interior demolition strips a building back to its frame. Drywall, ceilings, insulation, flooring, tile, cabinets and fixtures all come out. What stays is the structure, the roof and the exterior walls. Your builder or remodeler takes the space from there.

Flood work is its own version of this. Wet drywall and insulation have to come out fast so the framing can dry. We cut the drywall above the water line, pull the wet material and haul it away. One customer came to us after the 2024 hurricanes to gut flooded homes so they could dry out.

Commercial spaces run the same way. Retail units, offices, restaurant spaces and storage areas get stripped for the next tenant. If the space still holds shelving, fixtures and leftover stock, that part is a commercial cleanout. We handle both on the same job.

Permits and protecting the part that stays

Selective work needs a plan for everything that is staying put. Pools, driveways, screen enclosures, trees and the building next door get protected before the machine moves. We set where the excavator sits and where the trucks load, so nothing rolls over what stays. If the pool is going too, that is pool removal and it goes in the same estimate.

Hillsborough County requires a demolition permit, and work on a structure that stays can need a building permit too. Which ones apply depends on what is coming out and who has jurisdiction. Tampa, Temple Terrace and Plant City run their own permit offices. We check before the job starts.

Florida requires an asbestos inspection by a licensed asbestos consultant before work on regulated buildings. Notice goes to the local air program at least 10 working days ahead. In Hillsborough County the Environmental Protection Commission takes those notices. The rules read differently for a house than for a commercial building, so confirm your project with the county.

Old wood deck being torn apart behind a concrete block house Old white wood-sided house with a blue-tarped roof, waiting to be demolished

Ready to get started?

Free, no-obligation estimates across the Tampa Bay area.

(813) 239-4231
How We Work

How a Job With Global Construction Runs

From the first call or text to the clean lot at the end, here is how it goes.

1

Call or text

Call or text (813) 239-4231 with the address and what needs to come down. Photos of the structure help before we come out.

2

We look at the site

We come to the property and look at the structure or the lot. Size, what it is built of, access for the machines and where the debris goes all set the price. The estimate is free.

3

Permits and utilities

Hillsborough County requires a demolition permit, and it wants utility sign-offs before it issues one. A licensed asbestos inspector surveys the buildings the state rule covers. We work around the permit and the survey, and we confirm what your address needs.

4

The teardown

The excavator comes in and the structure comes down. Anything you are keeping stays protected while that happens. Debris goes into dump trucks and trailers as we work.

5

A clean lot

The last loads go out, and the slab and foundation go with them when you want them gone. We grade the ground so the lot sits level. Then you have a lot you can build on, sell or use.

FAQ

Selective Demolition Questions, Answered

Common questions about selective demolition across the Tampa Bay area. If yours is not here, call or text and ask.

Call (813) 239-4231

Can you demo just an addition and leave the house standing?
Yes. That is the most common selective demolition call we get. We separate the addition from the house and cap the utilities in the shared wall. The machine then takes the addition down, and the exposed wall gets closed in.
Can you gut a house down to the studs?
Yes. Interior demolition takes out drywall, ceilings, insulation, flooring, tile, cabinets and fixtures. The framing, the roof and the exterior walls stay put. We haul the material out and leave the space clear for the next trade.
Can you take out a load-bearing wall?
That depends on the design. A load-bearing wall carries weight from above, so something else has to carry it once the wall is gone. That part gets engineered and permitted first. We do the removal once the plan and the permit are in hand.
Where does the debris go?
It leaves with us. We load it into dump trucks and trailers. It goes to a county landfill or a construction and demolition recycling facility. We do the same debris hauling on other people's job sites.
How long does a selective demolition job take?
It depends on the size of the piece coming out and how it is attached. A small interior gut-out often runs a few days. A partial teardown with separation work takes longer, because the wall that stays has to be braced and closed in. You get a timeline with the estimate.
How do I get an estimate?
Call or text (813) 239-4231 and tell us what is coming out and what has to stay. We come look at the structure in person, because a selective job depends on how the pieces are tied together. More than 30 years of demolition work goes into reading that. Estimates are free anywhere in the area we cover, about 50 miles around Valrico.
More From Global Construction and Home Repair

Work That Pairs With Selective Demolition

House reduced to a pile of rubble with an excavator working behind it and a blue stucco wall fragment still standing

House Demolition

Full residential teardowns in the Tampa Bay area: houses, garages, additions, sheds and decks. We take the slab out, haul the debris and leave a clean, graded lot.

Learn More
Excavator pulling down the block walls of a large commercial building, with a deep pile of block and lumber rubble in front

Commercial Demolition

We take down block and frame commercial buildings, retail and restaurant spaces, warehouses, outbuildings and additions. The debris leaves with us and the pad is left clean.

Learn More
Pile of demolition debris with an excavator parked behind a tree at the edge of the lot

Debris Removal

We haul construction and demolition debris off job sites, remodels and teardowns around Tampa Bay. Concrete, lumber, drywall and metal get loaded with the excavator and hauled out in dump trucks.

Learn More
Why Choose Global Construction and Home Repair

Built for Demolition Work in the Tampa Bay Area

More than 30 years of demolition work

The demolition and construction work behind this company goes back more than three decades in the Tampa Bay area. Houses, garages, commercial buildings, pools and mobile homes have all come down. Storm and flood teardowns are part of that record.

The whole job from one company

One company takes the structure down, hauls the debris off and grades what is left. The dirt work after a teardown runs on the same job and the same schedule. That is one number to call, from the estimate to the finished lot.

Based in Valrico, working the Tampa Bay area

We work about 50 miles out from Valrico. That covers Hillsborough County towns like Tampa, Brandon, Riverview and Plant City, plus Lakeland and Winter Haven in Polk County. Wesley Chapel, Zephyrhills and Land O' Lakes in Pasco County are in range too.

Free estimates on the property

We come out, look at the structure or the lot and tell you how the job would run. The price comes from what is actually standing there. The visit is free and the work starts when you say go.

Guides and Resources

Selective Demolition Guides

Free Estimates

Get In Touch With Global Construction and Home Repair

Tell us where the property is and what needs to come down. Call or text (813) 239-4231, or send the form and we will set up a free estimate.

Get a Free Quote

Tell us about the job. We will get right back to you.